Training & User Onboarding

Training & User Onboarding

We recommend the following strategy for training end users.


FTT Dashboard 

The following components should be walked through

  • Date Filter

  • How to read the cards

  • Filter by status (success, failure, archive)

  • Filter by Floor

  • Filter by Device Type

  • Detailed Test Results


FTT Test + Trends + Floor Plan

  • Filter main page for a workflow

  • Select a successful result, walk through how the test is designed

  • Go back to the main dashboard and filter only for failures

  • Select a failed result, discuss the issue, click the device details, and filter to the last 7 days or last 30 days to see if this is a persistent or ongoing trend. Check the reference device. Check the device location to see the space on the floor. Read the nearby device names to see if they have failed as well.

  • Repeat for 2 - 3 failures per workflow type. Demonstrate the next test / previous test buttons


Floor Plans + Device Details + FTT Test

  • Pick a device on the floor plan, maybe one with an active fault

  • Show the latest FTT result and go to the test result arrow

  • Show the FTT on the left sidebar and access all the historical FTT results

  • Show how FTT can be run on command for a single device

  • Discuss how through continuous commissioning you will always have the latest test results to view anytime you access device details


FTT Project Creation

  • Walk through creating a project, tuning parameters, adjusting the schedule

  • See here for our full user guide on FTT projects.


    • Related Articles

    • FTT User Manual

      Understanding Functional Testing Traditionally, functional testing is a process that occurs during the commissioning phase of a building new construction or retrofit. When a building is commissioned, every piece of equipment must be inspected and ...
    • FDD User Manual

      Understanding Fault Detection & Diagnostics What is a Fault? A fault is a period of time in which a specified condition is true on a specific device. For example, this is a fault: @8:00am AHU-1 Could not maintain discharge temperature within setpoint ...
    • FTT PROJECTS USER GUIDE

      Hello there ? If you’re reading this, then you’re well on your way to functionally testing your building. To get started, enter the main FTT page from the left sidebar on KODE OS. In the 3 dots, you will see projects. FTT Projects are a new concept ...
    • Deployment Audit

      As your building is integrated into KODE OS, the feature in our platform “Deployment Audit” will offer insights into the integration process by defining which systems and devices have been successfully integrated and which are in the process. The ...
    • Handling FDD Config Updates in KODE OS

      This guide explains how updates to FDD Configs, Devices Points, Routines, and other FDD components are handled in KODE OS. All changes are tracked for transparency and troubleshooting. Important Before You Begin Always check if the specific point or ...