Training & User Onboarding
We recommend the following strategy for training end users.
FTT Dashboard
The following components should be walked through
FTT Test + Trends + Floor Plan
Filter main page for a workflow
Select a successful result, walk through how the test is designed
Go back to the main dashboard and filter only for failures
Select a failed result, discuss the issue, click the device details, and filter to the last 7 days or last 30 days
to see if this is a persistent or ongoing trend. Check the reference device. Check the device location to see
the space on the floor. Read the nearby device names to see if they have failed as well.
Repeat for 2 - 3 failures per workflow type. Demonstrate the next test / previous test buttons
Floor Plans + Device Details + FTT Test
Pick a device on the floor plan, maybe one with an active fault
Show the latest FTT result and go to the test result arrow
Show the FTT on the left sidebar and access all the historical FTT results
Show how FTT can be run on command for a single device
Discuss how through continuous commissioning you will always have the latest test results to view
anytime you access device details
FTT Project Creation
Walk through creating a project, tuning parameters, adjusting the schedule
See here for our full user guide on FTT projects.
Related Articles
FTT User Manual
Understanding Functional Testing Traditionally, functional testing is a process that occurs during the commissioning phase of a building new construction or retrofit. When a building is commissioned, every piece of equipment must be inspected and ...
FDD User Manual
Understanding Fault Detection & Diagnostics What is a Fault? A fault is a period of time in which a specified condition is true on a specific device. For example, this is a fault: @8:00am AHU-1 Could not maintain discharge temperature within setpoint ...
FTT PROJECTS USER GUIDE
Hello there ? If you’re reading this, then you’re well on your way to functionally testing your building. To get started, enter the main FTT page from the left sidebar on KODE OS. In the 3 dots, you will see projects. FTT Projects are a new concept ...
Deployment Audit
As your building is integrated into KODE OS, the feature in our platform “Deployment Audit” will offer insights into the integration process by defining which systems and devices have been successfully integrated and which are in the process. The ...
Handling FDD Config Updates in KODE OS
This guide explains how updates to FDD Configs, Devices Points, Routines, and other FDD components are handled in KODE OS. All changes are tracked for transparency and troubleshooting. Important Before You Begin Always check if the specific point or ...