Attachment Best Practices - MEPs, IP Lists, Network Risers

Attachment Best Practices - MEPs, IP Lists, Network Risers


Every myMSI project includes an attachments tab. This tab allows you to store various project collateral, information and documentation so that it can be referenced later. The attachments tab allows you to upload any file type and set an unlimited number of folders in which to organize the documentation.

Here is a starting guide of what we find to be the best way to organize our attachments:

Folders:

Folder Name

Sample Files

Definition/Description

Project Drawings




Architecturals

Technical drawing showing the architectural build of the building/area


BIM

3D CAD model of the building (if applicable)




Area Graphics




Floorplan - Lvl 1...Roof

SVG drawings of the different floor plans of the building, which will be used on KODE OS to display physical device placements


System Diagram

SVG drawings of larger mechanical systems which will be used on KODE OS to display mechanical component placements 




MEPs




Mechanical

Technical drawing showing the installation/layout of the mechanical equipment planned to go into the site.


Single Line

Symbolic representation of power delivery across the building with the various electrical components displayed (ex. metering)


Plumbing

Technical drawing showing the installation/layout of the plumbing equipment planned to go into the site




Controls




Shop drawings

A drawing/document indicating the expected installation, configuration and specifications of the HVAC Controls equipment


Product Manuals

Product information for all the HVAC controls equipment being installed on site


Network Riser

Document showing how HVAC controls will communicate with each other, what any network configurations (IPs, MACs, etc.) are, and how the system will communicate with the final control software




Lighting




Shop drawings

A drawing/document indicating the expected installation, configuration and specifications of the lighting equipment


API Docs or Points lists of Controllers

Documentation (whether API or direct points list) showing the exact data points the system will surface


Network Riser

Document showing how lighting equipment will communicate with each other, what any network configurations (IPs, MACs, etc.) are, and how the system will communicate with the final control software




System *




Deployment Drawings

A drawing/document indicating the expected installation, configuration and specifications of the system equipment


API Docs or Points lists of Controllers (if applicable)

Documentation (whether API or direct points list) showing the exact data points the system will surface


Product Manuals

Product information for all the equipment being installed on site


*A folder per system being installed, that contains the various documentation that outlines the system’s deployment and data specifications. Examples of systems include access control, CCTV, Occupancy, Fire, Generators, etc.



    • Related Articles

    • Why are my devices down?

      Where do I view my down devices? Navigate to the Network Status widget on the building dashboard. The yellow bar shows down devices, hovering over it will show you the number of down devices. Clicking on the yellow bar will display a list of down ...
    • How to add a new Gateway

      To add a new Gateway to your project go to myMSI > Projects > select a project of your choice > Gateways > Click + Add Gateway. In the Add Gateway(s) Page choose the way you want to add gateways, add a new gateway or choose from the Site. The Choose ...
    • FAQ for Trusted Organizations Management

      How Do I Navigate to the Trusted Organization Tab? The "Trusted Organization" tab is accessible from the Company module, featuring two nested tabs: "Outbound" and "Inbound." What is Displayed in the Outbound Organization List? The "Outbound" tab ...
    • How to add a new Plan to Projects

      To add a new plan go to myMSI > from the left main navigation bar select Projects, choose the project of your choice > go to Planning tab > click + Add New Plan > and then select . On the left section of the New Device page, that opens up once ...
    • Gateway vs Device

      MyMSI allows users to log useful information about all components pertaining to a building system. This information is primarily split into two separate pages, gateways and devices. This document will outline how to assess whether a piece of ...