AHU - Heating Operation

AHU - Heating Operation

Testing Procedure

Pre-Conditions Check

Before testing is started, it must be verified that the AHU is running and that return temperature is not so high that heating would not be detectable.
  • Verify that device is “Occupied”.
  • Verify fan is running by checking that duct pressure is more than 0.4psi [Pressure Min Threshold]
  • Verify that return temperature is less than 75°F [RAT Heating Thre​​​​shold] in order to be able to provide heating.
If any of these conditions are not met, STOP the workflow and ARCHIVE.

Setup Testing Conditions

In order to ensure that testing is accurate, outside sources of heating and cooling need to be eliminated or minimized and the mixed damper needs to be open. If any of these conditions are applicable and not verified, then the testing will be aborted.
Stop Active Heating
  • Verify that discharge temperature is within 10△°F [Heating - Delta] above mixed temperature
Stop Active Cooling
  • Verify that discharge temperature is within 10△°F [Cooling - Delta] below mixed temperature
Open Mixed Damper
  • Verify that mixed temperature is within 5△°F [Ventilation - Delta] below return temperature

Test Heating

Start Heating Operation
  • Command Heating to “ON”
  • Pass if Discharge Air is 10△°F [Heating - Delta] more than mixed temperature.
Or, if mixed temperature is not available,
  • Pass if Discharge Air is greater than 85°F [DAT Arb Heating Threshold] 


Parameters

DisplayHint
RAT Heating Threshold [75°F] How much should the RAT maximally be for our loop to be able to provide heating.
Ventilation - Delta [5△°F] The temperature threshold tolerance for fully open mixed damper. Delta below RAT for fully open mixed damper.
Heating - Delta [10△°F] The threshold tolerance for heating. The threshold tolerance for cooling. Delta between MAT and DAT.
Stabilization Time [60sec] How long to wait for the system to come to stability after we have given it an actuator command and the conditions have been fullfiled.
Reaction Time [300sec] How long to wait for the actuators to fully do their job.
Measure After [60sec] How long to wait in seconds to start checking the feedback readings.
Pressure Min Threshold [0.4psi] How much should the duct pressure be minimally.
Cooling - Delta [10△°F] The threshold tolerance for cooling. Delta between MAT and DAT.
DAT Arb Heating Threshold [85°F] The DAT above which there would be indication of heating.

    • Related Articles

    • VAV - Induced Heating

      This workflow will test a VAV box for its heating operation. First, we display the initial conditions of the equipment. Then KODE performs precondition checks to ensure the equipment is ready to be tested Next we will lower the setpoint to stop ...
    • AHU - Mixed Damper Operation

      Testing Procedure Pre-Conditions Check Before testing is started, it must be verified that the AHU is running. Verify that device is “Occupied”. Verify fan is running by checking that duct pressure is more than 0.4psi [Pressure Min Threshold] If any ...
    • AHU - VFD Operation

      Testing Procedure Pre-Conditions Check Before testing is started, it must be verified that the AHU is running. Verify that device is “Occupied”. Verify fan is running by checking that duct pressure is more than 0.4psi [Pressure Min Threshold] If this ...
    • AHU - Cooling Operation

      Testing Procedure Pre-Conditions Check Before testing is started, it must be verified that the AHU is running and that return temperature is not so high that heating would not be detectable. Verify that device is “Occupied”. Verify fan is running by ...
    • VAV - Heating Operation

      Testing Procedure Pre-Conditions Check Before testing is started, it must be verified that the VAV is in operation. Verify that VAV is “Occupied”. Verify that it’s parent AHU is “Occupied Verify fan is running by checking that duct pressure is more ...